Wednesday, April 29, 2009
Last post
This is the final blog post. We moved back in last night. Words escape me. Stay tuned for an updated website containing this blog, pictures, etc.
Friday, April 10, 2009
The end is near!
Our contractor tells us we will move in by the end of April. I'm speechless. In the meantime, here are some new pics:
The latest kitchen pic showing our gorgeous backsplash:

Calvin is installing our purified water system:

Here's how the front of the house is shaping up:

The glass panels in our loft got installed:
The latest kitchen pic showing our gorgeous backsplash:

Calvin is installing our purified water system:

Here's how the front of the house is shaping up:

The glass panels in our loft got installed:

Saturday, March 21, 2009
The kitchen nears completion
Here the workers put on the island top. You can see our macho Thermador refrigerator/freezer columns in the background:

Here's a better view of the fridge:

On the left - the star of the show - the BlueStar cooktop (6 burners, griddle and grill) and the BlueStar salamander broiler (1800°F!!):

To the far left, our Miele ovens: 1 main oven and 1 combo microwave/oven:

Our onyx bar top:

Here's a better view of the fridge:

On the left - the star of the show - the BlueStar cooktop (6 burners, griddle and grill) and the BlueStar salamander broiler (1800°F!!):

To the far left, our Miele ovens: 1 main oven and 1 combo microwave/oven:

Our onyx bar top:

Thursday, March 19, 2009
Our house is stoned
We're using lots of stone in our house:
Our master bathroom/shower/wetroom in flagstone:


Our entryway in quartzite:

Our guest bathroom shower in onyx:
Our master bathroom/shower/wetroom in flagstone:


Our entryway in quartzite:

Our guest bathroom shower in onyx:

Monday, March 16, 2009
Wednesday, March 4, 2009
Thursday, February 26, 2009
New day - new stuff
Our guest bath is getting tiled in this unique onyx we found (very cheap!)

Our walk-in closet is getting installed


Our walk-in closet is getting installed


Wednesday, February 25, 2009
Tuesday, February 24, 2009
Our cabinets have arrived
Our kitchen cabinets have arrived in preparation for installation. This might take a while...

Tuesday, February 17, 2009
Our beautiful floor is almost done
We decided to use an unusual wood for our floor: Tigerwood. Isn't it gorgeous?

Unfortunately, it is a very hard wood and is difficult to install. Calvin, our contractor, had to resort to these old-style tools/nails:

Even with those, the wood is still splitting a bit. Calvin thinks it will be OK, though:


Unfortunately, it is a very hard wood and is difficult to install. Calvin, our contractor, had to resort to these old-style tools/nails:

Even with those, the wood is still splitting a bit. Calvin thinks it will be OK, though:


Thursday, February 12, 2009
Our atrium is in!
A unique architectural feature of our remodel is an atrium/skylight that spans the roof over the entry. It was somewhat of an ordeal getting it together but now it's in and it's beautiful.

Here are some pics of the installation:


These are the tinted panels:

Here are some pics of the installation:


These are the tinted panels:

Thursday, February 5, 2009
Entrance coming together
The board-on-bat siding has started:

The quartzite entry stairs have started:

The quartzite entry stairs have started:

Wednesday, February 4, 2009
Feb Pics
Stucco has started:

The bath/shower area is starting to shape up:

The awesome view from the loft:

The bath/shower area is starting to shape up:

The awesome view from the loft:

Thursday, January 29, 2009
More random shots
Wow - every seam and nail head has to be covered as part of the sheetrocking process:

Our beautiful new ceiling!

Progress on the entry stairs continues:

Our beautiful new ceiling!

Progress on the entry stairs continues:

Tuesday, January 27, 2009
Some random new things
Our flooring is here! Apparently, it has to sit and acclimatize to the house for two weeks:

This is our ceiling with the new stain. Pretty!

Our new laundry closet:

This is our ceiling with the new stain. Pretty!

Our new laundry closet:

Friday, January 23, 2009
Working on the front stairs
The front stairs - how to get into the house - have been a bit of a mystery until now :) We weren't sure what to do. I think we finally have a good solution.



Saturday, January 17, 2009
Here comes the sheetrock!
The sheetrock installation has started. This means we're getting close to the completion. Woot!!!



Subscribe to:
Posts (Atom)